• Quick Set-up… typically
about 1-hour to place containment with tanks inside ready to tie in.
• Reliable…unitized design and fabricated to CWB specs
from 3/16” steel plate gives a high strength-to-weight ratio…
interior lined with chemical-resistant epoxy and exterior coated
with hi-gloss urethane for easier clean-up.
• Industry-Standard Connections…
2-sets of integrated internal/external 4”-150lb raised-face
flanges…offers surface line to storage tank tie-ins.
• Accessibility... 3-step, hand-railed platform crossover
provides sure-footed access for easy operation of storage tanks.
• In-Stock… multiple units are on-hand in our Weyburn and Stoughton yards for immediate delivery or pick-up.
When your well-site, lease or tankage requires containment,
call us for more information on how
JK Containments will save you time and money.
Home
| Containments
| Photos
© 2010 JK Containments. All
rights reserved.